RETURN

PERFO

Shenzhen Binhe Avenue Pavement Repair & Traffic Improvement, China

彩神x

 

彩神x

The reconstruction design scope of Binhe Avenue Expressway starts from Guangzhou-Shenzhen Highway Interchange in the west and ends at South Baoan Road in the east. The total length of this expressway is 9.975 km. The design velocity is 80km/h & 60km/h. The main road is a two-way road with 6~8 lanes in total and the auxiliary road is a two-way road with 4 lanes in total.